BWAG TEXT CLEAR bg

Baumber windfarm action group

One of the turbines operated by Ecotricity at Conisholme (NE Lincolnshire) suffered a catastrophic structural failure in freezing conditions during the night of January 3rd/4th. Two huge blades were severely damaged after apparently making contact with the tower. One blade has fallen to the ground only after shedding large pieces of debris from height and over a wide area. The base of the tower shows signs of a major impact as the blade smashed through the entrance structure at ground level before rolling into the neighbouring field. During sub-zero temperatures this accident combined with the recent "ice shedding" incident at Whittlesey and the subsequent shut down of the turbine there is raising concerns over safety and design.

Catastrophic failure at Conisholme

(January 2009)

Conisholme 1
Falling credibility